Client
WASTE MANAGEMENT OF GIPUZKOA
Location
Bergara (Gipuzkoa)
Project type
Detailed Project
P.E.C.
8.400.000€
The project develops the design of the separately collected biowaste composting facility with 9,000 tons treatment capacity.
The project includes the development of a MSW Transfer Station.