Client
WASTE MANAGEMENT OF GIPUZKOA
Location
Bergara (Gipuzkoa)
Project type
Detailed Project and Site Supervision
P.E.C.
1.000.000€
The project develops the first phase of the definition of the BioWaste Composting Plant.
During this project, two different water supply tanks (300m3 and 250m3) have been developed and built to store rain water from the roofs of the building in order to supply composting process and truck washing area water needs.