Zumaia Arroa cycle path – Zumaia –

Client GOVERNMENT OF GIPUZKOA
Location Zumaia (Gipuzkoa)
Project type Detailed Project
P.E.C. Phase I: 1.230.147,31€, Phase II: 732.451,46€

The purpose of the project is the definition of the works for the construction of a cyclist and pedestrian path, integrated in the second phase of the General Network Planning of Guipúzcoa (Donostia – Mutriku )

• Phase I: Zumaia – Narrondo : between the roundabout  ( Txiki – Erdi) and the neightborhood of Narrondo .

• Phase II : Narrondo – Arroa : between neighborhoods of Narrondo and Arroa .

The  cyclist and pedestrian  path consist of :

• Execution of a new cyclist and pedestrian path.

• Execution of the passage below N-634 road.

• Execution of retaining walls.

• Other works in the neighborhood of Narrondo, such as: new sidewalk for the bus stop, a leisure area, a children’s playground and an access ramp.

The projects includes drainage works, lighting , landscaping and environmental restoration,  signage, defenses and street furniture, and replacement of affected existing services.