The purpose of the project is the definition of the works for the construction of a cyclist and pedestrian path, integrated in the second phase of the General Network Planning of Guipúzcoa (Donostia – Mutriku )
• Phase I: Zumaia – Narrondo : between the roundabout ( Txiki – Erdi) and the neightborhood of Narrondo .
• Phase II : Narrondo – Arroa : between neighborhoods of Narrondo and Arroa .
The cyclist and pedestrian path consist of :
• Execution of a new cyclist and pedestrian path.
• Execution of the passage below N-634 road.
• Execution of retaining walls.
• Other works in the neighborhood of Narrondo, such as: new sidewalk for the bus stop, a leisure area, a children’s playground and an access ramp.
The projects includes drainage works, lighting , landscaping and environmental restoration, signage, defenses and street furniture, and replacement of affected existing services.